Time-effect of uplift bearing capacity of drilled grouting pile in ground of sandy soil and weathered sandrock
|更新时间:2026-06-25
|
Time-effect of uplift bearing capacity of drilled grouting pile in ground of sandy soil and weathered sandrock
Vol. 29, Issue 11, (2008)
作者机构:
青岛理工大学,青岛,266033
作者简介:
基金信息:
DOI:
CLC:TU473.1+4
Online First:07 August 2013,
Published:2008
稿件说明:
移动端阅览
ZHANG Ming-yi, LIU Jun-wei. Time-effect of uplift bearing capacity of drilled grouting pile in ground of sandy soil and weathered sandrock[J]. 2008, 29(11).
DOI:
ZHANG Ming-yi, LIU Jun-wei. Time-effect of uplift bearing capacity of drilled grouting pile in ground of sandy soil and weathered sandrock[J]. 2008, 29(11).DOI:
Time-effect of uplift bearing capacity of drilled grouting pile in ground of sandy soil and weathered sandrock
No explicit result has been achieved on the research of time-effect on uplift bearing capacity of drilled grouting pile in the ground of sandy soil and weathered sandrock. The mechanism of time-effect is analyzed by the data from the test and the construction draft of drilled grouting pile. It is shown that the time-effect of drilled grouting pile on sandy soil is significant under the effect of too thick lateral mud
even strong than cohesive soil. The uplift bearing capacity increases more quickly in the early period than that in the later. In order to make good use of the uplift pulling capacity
it is suggested that the resting phase before the pile test should be lengthened properly.