您当前的位置:
首页 >
文章列表页 >
Analytical solution of internal force and displacement in multi-center circular arc tunnel lining based on initial parameter method
更新时间:2026-06-25
    • Analytical solution of internal force and displacement in multi-center circular arc tunnel lining based on initial parameter method

    • Vol. 30, Issue 4, (2009)
    • CLC: U455
    • Online First:30 January 2011,

      Published:2009

    移动端阅览

  • SUN Fu-xue, CAI Xiao-hong, ZHU Yun-hui. Analytical solution of internal force and displacement in multi-center circular arc tunnel lining based on initial parameter method[J]. 2009, 30(4). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

2968

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Back analysis of internal force of initial support in tunnel based on touch stress
Horizontal vibration of pile group in saturated soil based on theory of porous media
Calculation model and algorithm for designing single anti-slide micropile
Anti-erosion mechanisms of microbially induced calcium carbonate precipitation-vegetation synergistic slope protection
Evaluation of liquefaction flow characteristics and soil state of saturated sand based on tension and compression apparent viscosity

Related Author

WEN Jing-zhou
ZHANG Yong-xing
WANG Cheng
LIU Lin-chao
YAN Qi-fang
YANG Xiao
WANG Jin-mei
ZHANG Ying-bin

Related Institution

College of Civil Engineering, Chongqing University
Key Laboratory of New Technology for Construction of Cities in Mountain Area, Ministry of Education, Chongqing University
Department of Tunnel and Geotechnical Engineering, Chongqing Jiaotong University
School of Civil Engineering, Xinyang Normal University
Department of Civil Engineering, Shanghai University
0