Three-dimensional nonlinear finite element simulation of excavation of the diversion tunnel No.1 for Nuozhadu Hydropower Station
|更新时间:2026-06-25
|
Three-dimensional nonlinear finite element simulation of excavation of the diversion tunnel No.1 for Nuozhadu Hydropower Station
Vol. 29, Issue 12, (2008)
作者机构:
1. 河海大学 岩土工程研究所,南京,210098
2. 国电昆明勘测设计研究院,昆明
作者简介:
基金信息:
DOI:
CLC:U451
Online First:11 August 2013,
Published:2008
稿件说明:
移动端阅览
ZHOU Jia-wen, XU Wei-ya, TONG Fu-guo, et al. Three-dimensional nonlinear finite element simulation of excavation of the diversion tunnel No.1 for Nuozhadu Hydropower Station[J]. 2008, 29(12).
DOI:
ZHOU Jia-wen, XU Wei-ya, TONG Fu-guo, et al. Three-dimensional nonlinear finite element simulation of excavation of the diversion tunnel No.1 for Nuozhadu Hydropower Station[J]. 2008, 29(12).DOI:
Three-dimensional nonlinear finite element simulation of excavation of the diversion tunnel No.1 for Nuozhadu Hydropower Station
During the excavation of the diversion tunnel No.1 for Nuozhadu Hydropower Station passing through the fault
F3 in the process of excavation
the strain and stress distribution of wall rock is controlled by the rock mass mechanical parameters around the influence zone of fault F3. Aiming to evaluating the stability of wall rock because of the excavation of layersⅡand Ⅲ; firstly
it needs back analysis of the rock mass mechanical parameters and the initial stress field of the wall rock around the fault F3 by using the displacement monitor data after the first layer excavation. Then
modeling of the first
second and third layers excavation used the rock mass mechanical parameters and the initial stress field which get through with back analysis method. The stress-strain situation of wall rock surrounds the fault F3 has got. The compute results show that the restriction of the tunnel rock mass surrounds the fault F3 is released gradually; the stress of the wall rock is increased gradually; and the displacements of the wall rock are also increased gradually with the uninterrupted excavation. And the stress-strain in the center zone of the fault F3 is unbalanced in evidence. It is shown that the excavation of the tunnel influenced by the fault F3 is obvious
monitor and analysis of later deformation in this zone need to be strengthened.