您当前的位置:
首页 >
文章列表页 >
Application of extrusion-sidewall technology to the project of rock fill dam with face slab
更新时间:2026-06-25
    • Application of extrusion-sidewall technology to the project of rock fill dam with face slab

    • Vol. 29, Issue S1, (2008)
    • CLC: TV641.4
    • Online First:15 April 2016,

      Published:2008

    移动端阅览

  • PENG Cheng, GUO De-fa, WANG Qing, et al. Application of extrusion-sidewall technology to the project of rock fill dam with face slab[J]. 2008, 29(S1). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

1479

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Current researches and prospects of dispersive clay
Analysis of push shear test without normal loading and its application
Application of the excavation controlling techniques of large-section in the Three Gorges project
Monitoring information feedback during comprehensive dynamical control about landslide
Research on equivalent cohesion

Related Author

LI Hong-liang
ZHAO Gao-wen
FAN Heng-hui
GU Jin-lüe
HE Jian-ming
LI Xiao
ZHANG Nian-xue
CHEN DUN-ke

Related Institution

College of Water Conservancy and Architectural Engineering , Northwest A&F University, Yangling
Key Laboratory of Engineering Geomechanics, Institute of Geology and Geophysics, Chinese Academy of Sciences
Changjiang Institute of Survey, Planning, Design and Research
Three Gorges Project Department, 14th Hydropower Bureau
College of Rerouces and Environmental Sciences, Key Laboratory for the Exploitation of Southwest Resources and the Environmental Disaster Control Engineering, Ministry of Education, Chongqing University
0