Pore water pressure analysis during construction of gravelly soil corewall rockfill dam
|更新时间:2026-06-25
|
Pore water pressure analysis during construction of gravelly soil corewall rockfill dam
Vol. 29, Issue S1, (2008)
作者机构:
1. 四川大学水利水电学院,四川,成都,610065
2. 中国水电顾问集团华东勘测设计研究院,浙江,杭州,310014
作者简介:
基金信息:
DOI:
CLC:TU457
Online First:15 April 2016,
Published:2008
稿件说明:
移动端阅览
CHEN Ji-ping, CAO Lin-xi, LIU Ming-hua, et al. Pore water pressure analysis during construction of gravelly soil corewall rockfill dam[J]. 2008, 29(S1).
DOI:
CHEN Ji-ping, CAO Lin-xi, LIU Ming-hua, et al. Pore water pressure analysis during construction of gravelly soil corewall rockfill dam[J]. 2008, 29(S1).DOI:
Pore water pressure analysis during construction of gravelly soil corewall rockfill dam
High excess pore water pressure will rise in the core wall of the earth dam during the construction period. For the high earth dam
the excess pore water pressure produced in the core wall of the earth dam during construction can not be effectively dissipated
which influences the stability and safety of the project. So the dam interior will possibly present the high pore water pressure. The influences of water content and construction progress on the pore water pressure are analyzed
based on monitored data. So,strengthening the pore water pressure monitoring and analysis during the construction period is important to the construction and design guidance and the safty of the dam.