The whole construction process of the intake chamber of Qincaosha water source site is modeled by 3D finite element codes Plaxis-3D Foundation; the influence on the intake chamber of the dike and management services is also analyzed; the measures to control settlement of the intake chamber are presented; the strain and stress of the intake chamber are given under 2 controlling conditions. The results provided valuable reference to design and construction.