Finite element simulation of excavation and support of abutment slope at Dagangshan Hydropower Project
更新时间:2026-06-25
    • Finite element simulation of excavation and support of abutment slope at Dagangshan Hydropower Project

    • Vol. 29, Issue S1, (2008)
    • CLC: O242.21
    • Online First:15 April 2016,

      Published:2008

    移动端阅览

  • QI Zu-fang, TANG Zhong-min, JIANG Qing-hui, et al. Finite element simulation of excavation and support of abutment slope at Dagangshan Hydropower Project[J]. 2008, 29(S1). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

1451

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Analysis of stress path and deformation-failure mechanism of high cutting loess slope
Using stochastic continuum model to simulate hydro-mechanical processes in deformed fractured rock during tunnel excavation
3D elastoplastic finite element simulation on excavation and reinforcement of the diversion tunnel outlet slope at the left bank of Jinping-I Hydropower Project
Numerical analysis of influence of vacuum preloading method on surrounding environment
Finite element simulation of permeable pipe pile driving considering consolidation process

Related Author

HOU Xiao-kun
LI Tong-lu
LI Ping
CHEN Wei
RUAN Huai-ning
CHEN Yi-feng
ZHOU Chuang-bing
YU Zhi-xiong

Related Institution

School of Geological Engineering and Surveying, Chang’an University
Key Laboratory for Geo-hazards in Loess Area of Ministry of Land and Resources, Xi’an Center of Geological Survey, China Geological Survey
Institute of Geotechnical Engineering, Hohai University
State Key Laboratory of Water Resources and Hydropower Engineering Science, Wuhan University
铁道第四勘察设计院
0