您当前的位置:
首页 >
文章列表页 >
Analysis and calculation of superimposed load induced by double parallel shield tunnelling
更新时间:2026-06-25
    • Analysis and calculation of superimposed load induced by double parallel shield tunnelling

    • Vol. 30, Issue 6, (2009)
    • CLC: U45
    • Online First:09 March 2011,

      Published:2009

    移动端阅览

  • QI Jing-jing, XU Ri-qing, WEI Gang. Analysis and calculation of superimposed load induced by double parallel shield tunnelling[J]. 2009, 30(6). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

2782

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Analysis of superimposed stress of surrounding soil due to shield tunneling
Study on calculating methods of soil vertical deformation induced by pipe jacking construction
Analysis of superimposed load induced by propulsion of adjacent level parallel pipe-jacking
Study of three-dimensional soil deformation caused by double-line parallel shield tunnel construction
Prediction of soil settlement induced by double-line shield tunnel based on Peck formula

Related Author

QI Jing-jing
WANG Tao
WEI Gang
XU Ri-qing
WEI Gang
CHEN Chun-lai
YU Jian-ying
WEI Xin-jiang

Related Institution

Department of Civil Engineering, City College of Zhejiang University
College of Civil Engineering and Architecture,Zhejiang University
Department of Civil Engineering, Zhejiang University City College
Department of Civil Engineering, Zhejiang University College City
Department of Civil Engineering,Yiwu Industrial & Commercial College,Yiwu
0