您当前的位置:
首页 >
文章列表页 >
Back analysis of initial geostress field of Zijinshan gold and copper mine
更新时间:2026-06-25
    • Back analysis of initial geostress field of Zijinshan gold and copper mine

    • Vol. 30, Issue 2, (2009)
    • CLC: TD321
    • Online First:27 January 2011,

      Published:2009

    移动端阅览

  • XU Chuan-hua, DIAO Hu, REN Qing-wen, et al. Back analysis of initial geostress field of Zijinshan gold and copper mine[J]. 2009, 30(2). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

913

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Settlement prediction of tunnel based on multiple kernels learning mode
Integrate intelligent method for multi message of tunnel open excavation adjoining bridge pile
Back analysis of frozen soil thermal properties based on simulated annealing optimization algorithm
Back analysis of initial geostress field of dam site in west route of South-to-North water transfer project
Prediction of landslide displacements through multimode support vector machine model

Related Author

ZHAO Jiong
XIONG Xiao-lei
ZHOU Qi-cai
FAN Si-xia
WU Biao
LI Peng
SONG Zhan-ping
SHA Quan-xian

Related Institution

School of Mechanical and Engineering, Tongji University
China Railway 13th Bureau Group 1st Engineering Co. Ltd.
Highway and Bridge Engineering Institute, Dalian Maritime University
Second Highway Consultants Co., Ltd., China Communication Construction Corporation
State Key Laboratory of Frozen Soil Engineering, Cold and Arid Regions Environmental and Engineering Research Institute, Chinese Academy of Sciences
0