Design of impermeable layer and discharge outlet system of large underground powerhouse
|更新时间:2026-06-25
|
Design of impermeable layer and discharge outlet system of large underground powerhouse
Vol. 29, Issue S1, (2008)
作者机构:
1. 中国水电顾问集团 华东勘测设计研究院,杭州,310014
2. 中国科学院武汉岩土力学研究所 岩土力学与工程国家重点实验室,武汉,430071
作者简介:
基金信息:
DOI:
CLC:TV223.4
Online First:15 April 2016,
Published:2008
稿件说明:
移动端阅览
YING He-ping, CHEN Xiang-rong, ZHOU Hui, et al. Design of impermeable layer and discharge outlet system of large underground powerhouse[J]. 2008, 29(S1).
DOI:
YING He-ping, CHEN Xiang-rong, ZHOU Hui, et al. Design of impermeable layer and discharge outlet system of large underground powerhouse[J]. 2008, 29(S1).DOI:
Design of impermeable layer and discharge outlet system of large underground powerhouse
located in Liangshan Autonomous Prefecture of Sichuan Province
is a highest water head and biggest capacity one at the in Yalong River. The underground powerhouse
the core of the project
is situated in right bank of V-shaped valley of the Yalong River. It meets the complicated groundwater seepage environment. For the safety of underground caverns
a reasonable layout of impermeable layer and discharge outlet is put forward based on the new design principle which is ponding first and discharge second
free drainage of high head wall
pumping of low head water
separating out water and inner water. Based on the result of 3D seepage numerical calculation of powerhouse region
the parameters of layer and discharge outlet system are also decided
which considers a rational safety scope. Practice of excavation of caverns proves that the design of seepage control and drainage system is reliable.