您当前的位置:
首页 >
文章列表页 >
Post-grouting technique for piled foundation: Case history of Su-Tong Bridge
更新时间:2026-06-25
    • Post-grouting technique for piled foundation: Case history of Su-Tong Bridge

    • Vol. 29, Issue 6, (2008)
    • CLC: TU472
    • Online First:15 July 2013,

      Published:2008

    移动端阅览

  • BU Ke-ming, YIN Kun-long, GONG Wei-ming. Post-grouting technique for piled foundation: Case history of Su-Tong Bridge[J]. 2008, 29(6). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

1148

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Group effects of pile tip resistance of under-reamed piles on uplift loading
Model test of vertical bearing capacity of cast-in-situ X-shaped concrete piles
Model experimental research on compacting effect of concreting for overlength and large-diameter bored pile
Study on rising height of grout along a pile after grouting and effect of grout on soils
Risk analysis of overlength bored piles construction on complicated geological conditions

Related Author

WANG Hao
WANG Zhi-qiang
DING Xuan-ming
LIU Han-long
ZHANG Min-xia
LIU Yan-jun
CHEN Zhi-jian
HUANG Sheng-gen

Related Institution

Shanghai Municipal Engineering Design Institute (Group) Co., Ltd.
Geotechnical Research Institute, Hohai University
College of Civil Engineering, Henan Polytechnic University
Key Laboratory of Ministry of Education for Geomechanics and Embankment Engineering, Hohai University
College of Civil Engineering, Hohai University
0