您当前的位置:
首页 >
文章列表页 >
Numerical analysis of construction displacements during structure-approaching of metro shield tunneling
更新时间:2026-06-25
    • Numerical analysis of construction displacements during structure-approaching of metro shield tunneling

    • Vol. 29, Issue 5, (2008)
    • CLC: U459
    • Online First:24 July 2013,

      Published:2008

    移动端阅览

  • XIA Yuan-you, ZHANG Liang-liang, WANG Ke-jing. Numerical analysis of construction displacements during structure-approaching of metro shield tunneling[J]. 2008, 29(5). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

1066

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Determination of engineering parameters based on mutable characteristics of monitored values in numerical simulation
Study of generating code system of FLAC3D for simulating complicated excavating process
Study and analysis of internal force induced by shield tunnel construction of adjacent structure
Numerical simulation of dynamic damage effect of surrounding rocks for tunnels by blasting excavation
Numerical simulation of failure mechanism of multilayer slope

Related Author

HUANG Gang-hai
MA Chang-nian
XU Guo-yuan
JIANG Wen-wu
LIU Xiao-ming
DING Zhi
WEI Xin-jiang
WEI Gang

Related Institution

Institute of Rock and Soil Mechanics, Chinese Academy of Sciences
School of Resources & Safety Engineering, Central South University
School of Civil & Transportation, South China University of Technology
College of Civil Engineering and Architecture, Zhejiang University
Department of Civil Engineering, Zhejiang University City College
0