3D numerical analysis of influence of tunnel construction on neighboring viaduct
|更新时间:2026-06-25
|
3D numerical analysis of influence of tunnel construction on neighboring viaduct
Vol. 29, Issue 5, (2008)
作者机构:
1. 华南理工大学 土木工程系/亚热带建筑科学国家重点实验室,广州,510640
2. 广州市市政工程设计研究院,广州,510060
作者简介:
基金信息:
DOI:
CLC:U45
Online First:24 July 2013,
Published:2008
稿件说明:
移动端阅览
LIU Ting-jin, WEI Li-xin, FANG Ying-guang, et al. 3D numerical analysis of influence of tunnel construction on neighboring viaduct[J]. 2008, 29(5).
DOI:
LIU Ting-jin, WEI Li-xin, FANG Ying-guang, et al. 3D numerical analysis of influence of tunnel construction on neighboring viaduct[J]. 2008, 29(5).DOI:
3D numerical analysis of influence of tunnel construction on neighboring viaduct
Influence on the neighboring viaduct pier’s extending footings was numerically studied by using MSC.Marc 3-D software
which induced by the tunnel staged construction and the traffic loading during the working period. The incremental developments of these extending footings’ stresses
settlements and inclinations were analysised
as well as the retaining structure’s lateral displacements. And the obtained results indicate that: (1) These extending footing’s unloading during the construction is due to that the tunnel bottom level is higher than these extending footing’s. (2) The No. 6 extending footing’s inclination and settlement is mainly induced by the planning traffic loading which directly acting on its one top side. (3) The extending footing’s maximum inclination is 0.000 6. (4) The extending footing’s maximum settlement induced by the tunnel traffic loading is 3.7 mm. Combined with the obtained results of the groundwater seepage
it deems that the tunnel construction and working period does not endanger the viaduct’s safety theoretically.