Dongjusigou railway tunnel wet sprayed fiber reinforced concrete lining structure and rock mass stability analysis using displacement fuzzy probability determination method
|更新时间:2026-06-25
|
Dongjusigou railway tunnel wet sprayed fiber reinforced concrete lining structure and rock mass stability analysis using displacement fuzzy probability determination method
Vol. 29, Issue 5, (2008)
作者机构:
江南大学 环境与土木工程学院,江苏,无锡,214122
作者简介:
基金信息:
DOI:
CLC:TU451
Online First:24 July 2013,
Published:2008
稿件说明:
移动端阅览
ZHOU Tai-quan, HUA Yuan. Dongjusigou railway tunnel wet sprayed fiber reinforced concrete lining structure and rock mass stability analysis using displacement fuzzy probability determination method[J]. 2008, 29(5).
DOI:
ZHOU Tai-quan, HUA Yuan. Dongjusigou railway tunnel wet sprayed fiber reinforced concrete lining structure and rock mass stability analysis using displacement fuzzy probability determination method[J]. 2008, 29(5).DOI:
Dongjusigou railway tunnel wet sprayed fiber reinforced concrete lining structure and rock mass stability analysis using displacement fuzzy probability determination method
The wet sprayed concrete technique has good virtue of improving the working condition within the tunnel. Compared with the common sprayed concrete technique
the wet sprayed concrete technique has fewer reflective concrete loss and higher sprayed concrete quality. It is worth of being spread in the tunnel lining structure construction process. The wet sprayed polypropylene fiber reinforced concrete was first introduced in the Dongjusigou railway tunnel lining structure in China Baoji-Lanzhou resuming line. The nonlinear least square method is used to regress the tunnel horizontal convergence curve at two transverse sections. The tunnel stability fuzzy probability analysis theory is applied to calculate the probability of the railway rock mass stability at different section locations. The analytical result shows that the railway rock mass using the wet-sprayed fiber reinforced concrete lining structure is in stable state and the tunnel rock mass has higher reliability index. The wet-sprayed fiber reinforced concrete lining structure has good lining effect.