Optimizing generator socket construction schemes of Shuibuya Underground Powerhouse based on intelligent back analysis
|更新时间:2026-06-25
|
Optimizing generator socket construction schemes of Shuibuya Underground Powerhouse based on intelligent back analysis
Vol. 29, Issue 5, (2008)
作者机构:
大连海事大学 交通工程与物流学院,大连,116026
作者简介:
基金信息:
DOI:
CLC:TV554
Online First:24 July 2013,
Published:2008
稿件说明:
移动端阅览
JIANG An-nan. Optimizing generator socket construction schemes of Shuibuya Underground Powerhouse based on intelligent back analysis[J]. 2008, 29(5).
DOI:
JIANG An-nan. Optimizing generator socket construction schemes of Shuibuya Underground Powerhouse based on intelligent back analysis[J]. 2008, 29(5).DOI:
Optimizing generator socket construction schemes of Shuibuya Underground Powerhouse based on intelligent back analysis
The generator sockets construction and the closely-related stability problem of lower side wall of Shuibuya Underground Powerhouse are key problems to solve in the powerhouse construction. Synthetically utilizing orthogonal design
three dimensional numerical simulation
genetic algorithm and support vector machine
the back analysis process for Shuibuya Underground Powerhouse is proposed. According to the process
using the monitoring data of upper sixth construction step
the mechanical parameters of surrounding rocks are back analyzed. Based on the mechanical parameters
the subsequent sockets construction schemes are numerically simulated and the optimal one is selected
so as to keep the stability of high side wall and generator sockets surrounding rocks. The optimizing result has guide meaning to the construction.