Analysis of additional stresses of soil disturbance induced by propulsion of double-O-tube shield
|更新时间:2026-06-25
|
Analysis of additional stresses of soil disturbance induced by propulsion of double-O-tube shield
Vol. 29, Issue 8, (2008)
作者机构:
1. 同济大学 地下建筑与工程系,上海,200092
2. 江苏省交通规划设计院,南京,210005
3. 深圳市建设工程质量监督总站,深圳,518032
作者简介:
基金信息:
DOI:
CLC:TU443
Online First:02 August 2013,
Published:2008
稿件说明:
移动端阅览
SUN Tong-li, ZHANG Qing-he, WEI Liang-wen, et al. Analysis of additional stresses of soil disturbance induced by propulsion of double-O-tube shield[J]. 2008, 29(8).
DOI:
SUN Tong-li, ZHANG Qing-he, WEI Liang-wen, et al. Analysis of additional stresses of soil disturbance induced by propulsion of double-O-tube shield[J]. 2008, 29(8).DOI:
Analysis of additional stresses of soil disturbance induced by propulsion of double-O-tube shield
The additional stresses induced by propulsion of double-o-tube(DOT) shield are calculated by means of the Mindlin’s equations in elasticity. The characteristics of additional stresses and the extent of soil disturbance of DOT shield construction are analyzed with compound Gauss-Legendre integral arithmetic. In the analysis
the excess earth pressure and the lateral friction between shield skin with surrounding soil are taken into account. The outcome makes clear that the soil disturbance of DOT shield has the regional characters
such as drag and extrusion above the sea-gulled segment and extrusion and friction lateral of the shield skin. The lateral friction has more effect on soil disturbance than the excess earth pressure. The conclusion can be as reference for the traversing construction nearby the underground pipeline and the building foundation for DOT shield.