您当前的位置:
首页 >
文章列表页 >
In-situ monitoring behaviors of middle wall of large-span multi-arch tunnel
更新时间:2026-06-25
    • In-situ monitoring behaviors of middle wall of large-span multi-arch tunnel

    • Vol. 29, Issue 9, (2008)
    • CLC: U451
    • Online First:03 August 2013,

      Published:2008

    移动端阅览

  • ZENG Sheng, QIN Qing-tong, YANG Jun-sheng. In-situ monitoring behaviors of middle wall of large-span multi-arch tunnel[J]. 2008, 29(9). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

1863

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Construction monitoring and numerical simulation of multi-arch tunnel
In-situ test and analysis of vibration of subgrade for Wuhan-Guangzhou high-speed railway
Research on calculation metheods of earth pressure on muti-arch tunnel for highway
Analysis of influence of dismantling temporary supports on preliminary lining of large-span shallow tunnel
Study on treatment schemes of an expressway multi-arch tunnel middle wall

Related Author

LI Xiao-jing
GE Lin-lin
GAO Yong-tao
WU Shun-chuan
JI Mao-wei
GUO Zhi-guang
WEI Li-min
WANG Yong-he

Related Institution

School of Civil and Environmental Engineering, the University of New South Wales
School of Surveying & Spatial Information Systems, the University of New South Wales
School of Civil and Environmental Engineering, University of Science and Technology Beijing
Department of Civil Engineering and Mechanics, Xiangtan University
School of Civil Engineering, Central South University
0