您当前的位置:
首页 >
文章列表页 >
Research on simplified structural calculation method for up bamboo-truncated tunnel portal
更新时间:2026-06-25
    • Research on simplified structural calculation method for up bamboo-truncated tunnel portal

    • Vol. 29, Issue 1, (2008)
    • CLC: U451
    • Online First:18 July 2013,

      Published:2008

    移动端阅览

  • ZHENG Yu-chao, QIU Wen-ge, ZHANG Jun-ru. Research on simplified structural calculation method for up bamboo-truncated tunnel portal[J]. 2008, 29(1). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

1753

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Characteristics and simplified calculation method of creep settlement of high fill foundation in mountain area
Uplift mechanism and calculation method of constrained grouting pile under disturbed conditions
A simplified method and affecting factors for double pile-column foundation in abrupt slope
Simplified calculation method for the fundamental period of layered soil sites
Centrifugal model tests and calculation method of uplift bearing capacity of rock-socketed pedestal pile overburden soil

Related Author

CAO Guang-xu
SONG Er-xiang
YANG Tian-xiao
HU Zi-xuan
CAI De-yong
WANG Chang-hong
WANG Gui-yao
FENG Xia-ting

Related Institution

Key Laboratory of Civil Engineering Safety and Durability of China Education Ministry, Tsinghua University
Department of Civil Engineering, School of Mechanics and Engineering Sciences, Shanghai University
State Key Laboratory of Geomechanics and Geotechnical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences
School of Civil Engineering and Architecture, Changsha University of Science & Technology
Key Laboratory of Earthquake Engineering and Engineering Vibration, Institute of Engineering Mechanics, China Earthquake Administration
0