Research on simplified structural calculation method for up bamboo-truncated tunnel portal
|更新时间:2026-06-25
|
Research on simplified structural calculation method for up bamboo-truncated tunnel portal
Vol. 29, Issue 1, (2008)
作者机构:
西南交通大学 土木工程学院,成都,610031
作者简介:
基金信息:
DOI:
CLC:U451
Online First:18 July 2013,
Published:2008
稿件说明:
移动端阅览
ZHENG Yu-chao, QIU Wen-ge, ZHANG Jun-ru. Research on simplified structural calculation method for up bamboo-truncated tunnel portal[J]. 2008, 29(1).
DOI:
ZHENG Yu-chao, QIU Wen-ge, ZHANG Jun-ru. Research on simplified structural calculation method for up bamboo-truncated tunnel portal[J]. 2008, 29(1).DOI:
Research on simplified structural calculation method for up bamboo-truncated tunnel portal
The bamboo-truncating tunnel portal’s structure is at complicated 3D stress condition
so 3D numerical calculation method is necessary to used for correct result relatively. For the simplifying calculation model
the trial was carried out for up bamboo-truncating tunnel portal which with the slope 1: 1.5 in Class Ⅴ surrounding rock. Firstly
the model test result was used to proof the arch crown surrounding rock stress which gained by 3D numerical analysis
both have good compatibility. Secondly proceed from the structural stress character and the distribution of surrounding rock stress
the inner force controlling cross-section of structural transverse and longitudinal direction were gained. Through the research
the relationship between q and of arch crown load in each pressure distribution figure was also obtained. Furthermore
the pressure distribution graphics in transverse direction was plotted; and load value calculation methods in longitudinal direction was provided. Therefore
the calculation model was simplified from 3D numerical structural calculation to load-structure model with transverse and longitudinal direction to calculate its inner force separately.