您当前的位置:
首页 >
文章列表页 >
Analysis and dynamic prediction of longitudinal ground settlements due to shield tunneling based on delayed difference equation
更新时间:2026-06-25
    • Analysis and dynamic prediction of longitudinal ground settlements due to shield tunneling based on delayed difference equation

    • Vol. 29, Issue 1, (2008)
    • CLC: TU431
    • Online First:18 July 2013,

      Published:2008

    移动端阅览

  • ZHANG Shu-feng, SUN Shu-lin, JIANG Zhi-qiang. Analysis and dynamic prediction of longitudinal ground settlements due to shield tunneling based on delayed difference equation[J]. 2008, 29(1). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

1277

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Study of construction mechanical behavior of parallel-small spacing metro tunnels excavated by shield method and cross diaphragm (CRD) method in loess region
Development of real time decision-making system for ground deformation due to shield tunneling
Numerical analysis of effects of parallel shield tunneling on existent tunnel
2D FEM numerical simulation for tunnels of Wuhan subway system planned to be constructed with shield method
Anti-erosion mechanisms of microbially induced calcium carbonate precipitation-vegetation synergistic slope protection

Related Author

KONG Xiang-xing
XIA Cai-chu
QIU Yu-liang
ZHANG Li-ying
GONG Jian-wu
ZHANG Shu-feng
JIANG Zhi-qiang
SUN Shu-lin

Related Institution

Deparment of Geotechnical Engineering, Tongji University
Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education, Tongji University
The First Highway Survey and Design Institute of China Communications Construction Company Ltd.
School of City Construction, Wuhan University of Science and Technology
Nanjing Metro Co. Ltd
0