Analysis and dynamic prediction of longitudinal ground settlements due to shield tunneling based on delayed difference equation
|更新时间:2026-06-25
|
Analysis and dynamic prediction of longitudinal ground settlements due to shield tunneling based on delayed difference equation
Vol. 29, Issue 1, (2008)
作者机构:
河海大学 地质及岩土工程系,南京,210098
作者简介:
基金信息:
DOI:
CLC:TU431
Online First:18 July 2013,
Published:2008
稿件说明:
移动端阅览
ZHANG Shu-feng, SUN Shu-lin, JIANG Zhi-qiang. Analysis and dynamic prediction of longitudinal ground settlements due to shield tunneling based on delayed difference equation[J]. 2008, 29(1).
DOI:
ZHANG Shu-feng, SUN Shu-lin, JIANG Zhi-qiang. Analysis and dynamic prediction of longitudinal ground settlements due to shield tunneling based on delayed difference equation[J]. 2008, 29(1).DOI:
Analysis and dynamic prediction of longitudinal ground settlements due to shield tunneling based on delayed difference equation
In accordance with the interval shield tunnel of Nanjing Metro
the longitudinal ground settlement is theoretically analyzed. The area of longitudinal ground settlement by shield driven in Nanjing Metro is firstly presented; and the percentages of different course are summed up. In view of the complexity and instability of the information of ground settlement
the longitudinal ground settlement is considered as a stochastic process. Based on the delayed difference equation
the model for dynamic prediction is proposed. The predicting results
Study of construction mechanical behavior of parallel-small spacing metro tunnels excavated by shield method and cross diaphragm (CRD) method in loess region
Development of real time decision-making system for ground deformation due to shield tunneling
Numerical analysis of effects of parallel shield tunneling on existent tunnel
2D FEM numerical simulation for tunnels of Wuhan subway system planned to be constructed with shield method