您当前的位置:
首页 >
文章列表页 >
Numerical simulation of stemming length in tunnel smooth blasting
更新时间:2026-06-25
    • Numerical simulation of stemming length in tunnel smooth blasting

    • Vol. 29, Issue 9, (2008)
    • CLC: O389
    • Online First:03 August 2013,

      Published:2008

    移动端阅览

  • LUO Wei, ZHU Chuan-yun, ZHU Qi-hu. Numerical simulation of stemming length in tunnel smooth blasting[J]. 2008, 29(9). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

2640

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Improvement of finite element method for beam on elastic foundation with linearly distributed coefficient of subgrade reaction
Evolution of energy field instability of island longwall panel during coal bump
Elasto-viscoplastic model and its application to settlement calculation of soft foundation by preloading treatment
Study of influences of existing pile foundation loads on adjacent tunnel excavation and internal forces of primary support
Search of three-dimensional slip surface for slope based on finite element calculation

Related Author

FENG You-quan
YANG Min
CHEN Jun-ling
WANG Hong-wei
JIANG Yao-dong
GAO Ren-jie
LIU Shuai
HU Sheng-xia

Related Institution

College of Civil Engineering, Tongji University
School of Mechanics and Civil Engineering, China University of Mining and Technology
State Key Laboratory of Coal Resources and Safe Mining, China University of Mining and Technology
School of Architectural and Civil Engineering, Yanan University, Yanan
Key Laboratory of Ministry of Education for Geomechanics and Embankment Engineering, Hohai University
0