您当前的位置:
首页 >
文章列表页 >
Prediction of ground surface movement and deformation in constructing large cross-section tunnel by shallow-burying and hidden-digging method
更新时间:2026-06-25
    • Prediction of ground surface movement and deformation in constructing large cross-section tunnel by shallow-burying and hidden-digging method

    • Vol. 29, Issue 2, (2008)
    • CLC: U459
    • Online First:10 July 2013,

      Published:2008

    移动端阅览

  • SHI Ya-xin, TAO De-jing, WANG Ming-nian. Prediction of ground surface movement and deformation in constructing large cross-section tunnel by shallow-burying and hidden-digging method[J]. 2008, 29(2). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

1182

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Current status and tendency of analyzing methods for stability of rockmass surrounding underground hydraulic works
Comparative theoretical and experimental analysis of rock breaking by tunnel boring machine disc cutters
Progressive fracture evolution and mechanical response of cavity-containing sandstone under low-frequency disturbance
Mechanism of water infiltration affecting ground ice melting in the silty clay layers of the Dema Expressway in the eastern Qinghai-Xizang Plateau
Nonlinear mechanical response of surrounding rock in compressed air energy storage cavern based on Hoek-Brown criterion

Related Author

YAN Jian-hua
TANG Lei

Related Institution

Nanjing Hydraulic Research Institute
南京水利科学研究院
0