Discussion on monitoring results of displacements, settlements and inner forces of a foundation pit and early-warning value
|更新时间:2026-06-25
|
Discussion on monitoring results of displacements, settlements and inner forces of a foundation pit and early-warning value
Vol. 29, Issue 4, (2008)
作者机构:
南京航空航天大学土木工程系,南京,210016
作者简介:
基金信息:
DOI:
CLC:T413.6+2
Online First:10 July 2013,
Published:2008
稿件说明:
移动端阅览
LI Jun, ZHANG Xiao-ping. Discussion on monitoring results of displacements, settlements and inner forces of a foundation pit and early-warning value[J]. 2008, 29(4).
DOI:
LI Jun, ZHANG Xiao-ping. Discussion on monitoring results of displacements, settlements and inner forces of a foundation pit and early-warning value[J]. 2008, 29(4).DOI:
Discussion on monitoring results of displacements, settlements and inner forces of a foundation pit and early-warning value
Basing on construction monitoring of the supporting system for a deep foundation pit
a study on the displacement
settlement
inner force and water level are carried out. It is indicated that the horizontal displacements of timbering stakes as well as observation spots outside increase step by step along with the increase of the excavation depth and construction time. Meanwhile its increasing velocity tends to steady gradually. In addition
the displacements are also related to the location of building nearby and the supporting condition. The settlement of building nearby increases with time
and is greater near to the pit. The settlement of standing column and the apophysis of earth are related to the bearing weight and the form of pits. The axial force of support is related to earth condition
support rigidity as well as order and velocity of construction
etc.The partiality value of stake body is small; the bottom can be calculated according to axial forces. The early-warning value is taken into account in this paper.