Discussion on calculation of loose load on extra-large cross-section and large-span road tunnel
|更新时间:2026-06-25
|
Discussion on calculation of loose load on extra-large cross-section and large-span road tunnel
Vol. 29, Issue 4, (2008)
作者机构:
1. 同济大学地下建筑与工程系,上海,200092
2. 上海投资咨询公司,上海,200003
3. 同济大学岩土工程重点实验室,上海,200092
作者简介:
基金信息:
DOI:
CLC:TU451+.2
Online First:10 July 2013,
Published:2008
稿件说明:
移动端阅览
QU Hai-feng, ZHU He-hua, CAI Yong-chang. Discussion on calculation of loose load on extra-large cross-section and large-span road tunnel[J]. 2008, 29(4).
DOI:
QU Hai-feng, ZHU He-hua, CAI Yong-chang. Discussion on calculation of loose load on extra-large cross-section and large-span road tunnel[J]. 2008, 29(4).DOI:
Discussion on calculation of loose load on extra-large cross-section and large-span road tunnel
Theory equations and norm equations are primary methods to calculate loose load of tunnel. They are established based on the statistic and analysis of loose load from finished tunnels in general. With the development of road tunnel construction
the two-way and large-span road tunnel with eight-lane in either way become a new shape in recent years. The eight-lane tunnel has an increase in excavation area and a decrease in excavation height relatively for the aim of curtailing the cost of construction and has a smaller ratio of height to width. For this reason
current calculation method of loose load whether or not apply to barge-span tunnel has been significant for tunnel design. In this paper
firstly
various calculation methods are summarized and applied to Longtoushan Road Tunnel with eight-lane and barge-span. And then
calculation results are analyzed and compared. Secondly
rationality of calculation methods for Longtoushan Tunnel is analyzed based on numerical calculation and measured data. Finally
the paper presents and discusses applicability of various methods
especially for the eight-lane and barge-span tunnel
based on its own background and above study course. The purpose of the article is to provide reference for the design of extra-large cross-section and barge-span road tunnel.