您当前的位置:
首页 >
文章列表页 >
Using stochastic continuum model to simulate hydro-mechanical processes in deformed fractured rock during tunnel excavation
更新时间:2026-06-25
    • Using stochastic continuum model to simulate hydro-mechanical processes in deformed fractured rock during tunnel excavation

    • Vol. 29, Issue 10, (2008)
    • CLC: O242.1
    • Online First:03 August 2013,

      Published:2008

    移动端阅览

  • CHEN Wei, RUAN Huai-ning. Using stochastic continuum model to simulate hydro-mechanical processes in deformed fractured rock during tunnel excavation[J]. 2008, 29(10). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

1456

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Analysis of stress path and deformation-failure mechanism of high cutting loess slope
Finite element simulation of excavation and support of abutment slope at Dagangshan Hydropower Project
Finite element simulation of permeable pipe pile driving considering consolidation process
Influence of excavation unloading on vertical bearing behavior of existing pile groups
Reliability analysis of landslide-thrust and internal forces of anti-slide pile based on strength reduction finite element method

Related Author

HOU Xiao-kun
LI Tong-lu
LI Ping
QI Zu-fang
TANG Zhong-min
JIANG Qing-hui
WEI Wei
PAN Shao-hua

Related Institution

School of Geological Engineering and Surveying, Chang’an University
Key Laboratory for Geo-hazards in Loess Area of Ministry of Land and Resources, Xi’an Center of Geological Survey, China Geological Survey
State Key Laboratory of Water Resources and Hydropower Engineering Science, Wuhan University
Chengdu Hydroelectric Investigation and Design Institute, China Hydropower Consulting Group
College of Transportation Engineering, Nanjing University of Technology
0