Study on acceptable minimum interval of long deeply burial hydropower tunnels in Jinping II hydropower station
|更新时间:2026-06-25
|
Study on acceptable minimum interval of long deeply burial hydropower tunnels in Jinping II hydropower station
Vol. 29, Issue 3, (2008)
作者机构:
中国科学院武汉岩土力学研究所 岩土力学与工程国家重点实验室,武汉,430071
作者简介:
基金信息:
DOI:
CLC:TU451
Online First:19 July 2013,
Published:2008
稿件说明:
移动端阅览
JIANG Quan, FENG Xia-ting, ZHOU Hui. Study on acceptable minimum interval of long deeply burial hydropower tunnels in Jinping II hydropower station[J]. 2008, 29(3).
DOI:
JIANG Quan, FENG Xia-ting, ZHOU Hui. Study on acceptable minimum interval of long deeply burial hydropower tunnels in Jinping II hydropower station[J]. 2008, 29(3).DOI:
Study on acceptable minimum interval of long deeply burial hydropower tunnels in Jinping II hydropower station
The four hydropower tunnels of Jinping II Hydropower Station are mostly over burden of 2000 m
surrounded by more than 44.2MPa high initial stress and 10MPa pore water pressure. It is a great challenge for designers to determine the acceptable minimum interval under extremely complex geological conditions. So a integrated criterion for determining acceptable minimum interval is proposed according to (1) the plastic zone connecting or not; (2) the inflexion of displacement curve of key points in tunnel. (3) convergence displacement not exceeding the state specification. With above guidelines
the theoretical minimum interval of tunnel of 50 m is obtained
by hydro-mechanics coupling numerical simulation. At last
the modified result of 52 m is recommended for the acceptable minimum interval according to engineering analogy analysis of several typical deep tunnels. The conclusion shows that the design interval of 60 m at present is reasonable.