您当前的位置:
首页 >
文章列表页 >
Study on acceptable minimum interval of long deeply burial hydropower tunnels in Jinping II hydropower station
更新时间:2026-06-25
    • Study on acceptable minimum interval of long deeply burial hydropower tunnels in Jinping II hydropower station

    • Vol. 29, Issue 3, (2008)
    • CLC: TU451
    • Online First:19 July 2013,

      Published:2008

    移动端阅览

  • JIANG Quan, FENG Xia-ting, ZHOU Hui. Study on acceptable minimum interval of long deeply burial hydropower tunnels in Jinping II hydropower station[J]. 2008, 29(3). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

2101

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Experimental study on the definition and evolution characteristics of unfrozen water retention states in frozen clay
Nonlinear mechanical response of surrounding rock in compressed air energy storage cavern based on Hoek-Brown criterion
Mechanism of water infiltration affecting ground ice melting in the silty clay layers of the Dema Expressway in the eastern Qinghai-Xizang Plateau
Strength development model for slurry-like mud treated by physicochemical combined method considering preloading stress
Engineering characteristics of xanthan gum improved sandy slope soil and slope ecological protection mechanism

Related Author

No data

Related Institution

No data
0