您当前的位置:
首页 >
文章列表页 >
Segmental mechanical analysis of shield tunnel during construction stage
更新时间:2026-06-25
    • Segmental mechanical analysis of shield tunnel during construction stage

    • Vol. 29, Issue 3, (2008)
    • CLC: U455.43
    • Online First:19 July 2013,

      Published:2008

    移动端阅览

  • SONG Ke-zhi, YUAN Da-jun, WANG Meng-shu. Segmental mechanical analysis of shield tunnel during construction stage[J]. 2008, 29(3). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

2952

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Determination of the range of shield tunneling-induced soil disturbance
Intelligent geological condition recognition in shield tunneling via time-series clustering and online learning
Shield-soil interaction model and numerical solution methodology considering active articulation system
Finite element simulation of permeable pipe pile driving considering consolidation process
Analysis of stress path and deformation-failure mechanism of high cutting loess slope

Related Author

LI Chun-lin
MIAO Lin-chang
ZHEN Jia-jie
LAI Feng-wen
HUANG Ming
LIAO Qing-xiang
LI Shuang
DUAN Yue-qiang

Related Institution

School of Civil and Architectural Engineering, Tongling University
Institute of Geotechnical Engineering, Southeast University
College of Civil Engineering, Fuzhou University
College of Transportation and Civil Engineering, Fujian Agriculture and Forestry University
Fujian Fuzhou Construction Development Group Co. Ltd.
0