您当前的位置:
首页 >
文章列表页 >
Three-dimensional foundation stability analysis of 5th dam block of intake of Gongboxia hydroelectric station
更新时间:2026-06-25
    • Three-dimensional foundation stability analysis of 5th dam block of intake of Gongboxia hydroelectric station

    • Vol. 28, Issue S1, (2007)
    • CLC: V64
    • Online First:28 March 2014,

      Published:2007

    移动端阅览

  • ZHOU Long-long, SHE Cheng-xue. Three-dimensional foundation stability analysis of 5th dam block of intake of Gongboxia hydroelectric station[J]. 2007, 28(S1). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

260

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Discussion on force between columns of three-dimensional limit equilibrium for slope stability analysis
Deformation and stability analysis of right abutment of Danjiang arch dam
Approximate three-dimensional analysis of load-carrying behaviour of barrettes
3D stability analysis of landslides based on strength reduction (Ⅱ): evaluation of reinforcing factor of safety
Optimal design of lining structure in artificial cavern of compressed air energy storage

Related Author

ZHANG Zhen-hua
LUO Xian-qi
YUAN Heng
SHE Cheng-xue
LIU Qiu-yin
LIN Hai-quan
SHI Jian-yong
HONG Xin

Related Institution

School of Naval Architecture, Ocean and Civil Engineering, Shanghai Jiao Tong University
Chongqing Research & Design Institute of Sino-Coal International Engineering Group
Institute of Geologic Disaster, China Three Gorges University
Design and Research Institute of Hydraulic and Hydropower Engineering of Hunan Province
Kunshan Construction Engineering Quality Testing Center, Kunshan
0