Three-dimensional numerical simulation of construction for bias closely spaced tunnels with altitude difference
|更新时间:2026-06-25
|
Three-dimensional numerical simulation of construction for bias closely spaced tunnels with altitude difference
Vol. 28, Issue S1, (2007)
作者机构:
同济大学 地下建筑与工程系,上海,200092
作者简介:
基金信息:
DOI:
CLC:U451
Online First:28 March 2014,
Published:2007
稿件说明:
移动端阅览
DU Ju-hong, HUANG Hong-wei. Three-dimensional numerical simulation of construction for bias closely spaced tunnels with altitude difference[J]. 2007, 28(S1).
DOI:
DU Ju-hong, HUANG Hong-wei. Three-dimensional numerical simulation of construction for bias closely spaced tunnels with altitude difference[J]. 2007, 28(S1).DOI:
Three-dimensional numerical simulation of construction for bias closely spaced tunnels with altitude difference
which is the bias closely spaced and shallow twin tunnel with altitude difference in two tunnels and constructed by using NATM
as the engineering background and applying MARC finite element software
non-linear three dimensional numerical simulation of construction process under different lagging distance between the twin tunnel excavated faces is performed. It is found that the change of the excavated face distance has a stronger influence on the horizontal displacement than on the vertical displacement of each tunnel
and especially for the left tunnel. Longer of excavated face distance is
smaller displacements at tunnel periphery and pillar is larger than the ground surface settlement in the special area