您当前的位置:
首页 >
文章列表页 >
Research on calculation method of digging length in tunnel with underground excavation under shallow cover
更新时间:2026-06-25
    • Research on calculation method of digging length in tunnel with underground excavation under shallow cover

    • Vol. 28, Issue S1, (2007)
    • CLC: U452
    • Online First:28 March 2014,

      Published:2007

    移动端阅览

  • WANG Zhi-da, GONG Xiao-nan, CAI Zhi-jun. Research on calculation method of digging length in tunnel with underground excavation under shallow cover[J]. 2007, 28(S1). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

674

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Calculation method of digging length in underpass with underground excavation under shallow cover
Optimal design of lining structure in artificial cavern of compressed air energy storage
Experimental study on the definition and evolution characteristics of unfrozen water retention states in frozen clay
Mechanical properties and microstructural evolution of peaty soils subjected to freeze-thaw cycles
Engineering characteristics of xanthan gum improved sandy slope soil and slope ecological protection mechanism

Related Author

WANG Zhi-da
GONG Xiao-nan

Related Institution

MOE Key Laboratory of Soft Soils and Geoenvironmental Engineering, Zhejiang University, Hangzhou 310027, China 2. Hangzhou Municipal Public Construction Development Company
0