Numerical analysis of the long-term stability of the seepage tunnel in Jinping II Hydropower Station
|更新时间:2026-06-25
|
Numerical analysis of the long-term stability of the seepage tunnel in Jinping II Hydropower Station
Vol. 28, Issue S1, (2007)
作者机构:
中国科学院武汉岩土力学研究所 岩土力学与工程国家重点实验室,武汉,430071
作者简介:
基金信息:
DOI:
CLC:U451
Online First:28 March 2014,
Published:2007
稿件说明:
移动端阅览
CHEN Guo-qing, FENG Xia-ting, ZHOU Hui, et al. Numerical analysis of the long-term stability of the seepage tunnel in Jinping II Hydropower Station[J]. 2007, 28(S1).
DOI:
CHEN Guo-qing, FENG Xia-ting, ZHOU Hui, et al. Numerical analysis of the long-term stability of the seepage tunnel in Jinping II Hydropower Station[J]. 2007, 28(S1).DOI:
Numerical analysis of the long-term stability of the seepage tunnel in Jinping II Hydropower Station
The four seepage tunnels in Jinping II Hydropower Station are buried in the hard brittle rockmass. The complex geological condition including high stress induced by great depth and high seepage pressure will bring about many engineering problems
especially the long term stability problem. In order to reflect the character of the visco-plastic deformation
the combinative models of cohesion weakening-friction strengthening model and the visco-elastic model are introduced in this study. And based on the in-situ displacement monitoring data
the visco-elasto-plastic model and its parameters are obtained by the intelligent method based on GP and PSO methods. The rheological mechanic characters of the surrounding rockmass in the seepage tunnels are simulated by using FLAC3D. At the same time
this program can also simulate the mechanism between the sprayed concrete
rock bolts and rockmass and the coupling effect of fluid and solid under the high seepage pressures on the structures. Through the analysis of the calculated results
the long term stability of the tunnels is estimated by using the integrating method of multi-index including displacement
displacement velocity
stress
failure approach index and the internal force in the support structures and soon. The results are of importance to the design and construction of this project.
Calculation method of sliding surface stress based on segmented sliding surface stress measurement system
Relationship between particle micro and macro mechanical parameters of parallel-bond model
Dynamic point safety factor analysis method of seismic stability of geosynthetics reinforced soil slope
Analysis of effect of anchor on deformation and force of double-row piles
Numerical analysis and test verification of penetration resistance for bucket foundation installation considering effect of soil squeezing
Related Author
CHEN Huai-lin
YANG Tao
RAO Yun-kang
ZHANG Zhe
WU Hong-gang
XIE Jiang-wei
TENG Han-qing
ABI ERDI
Related Institution
State Key Laboratory of Intelligent Construction and Maintenance for Geotechnical and Tunnel Engineering under Extreme Environments, Southwest Jiaotong University
China Northwest Research Institute Co., Ltd., of CREC
China Railway Academy Co., Ltd.
School of River & Ocean Engineering, Chongqing Jiaotong University
State Key Laboratory of Geomechanics and Geotechnical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences