您当前的位置:
首页 >
文章列表页 >
Optimization of excavation and seepage control scheme for main lake district of Dragon Lake
更新时间:2026-06-25
    • Optimization of excavation and seepage control scheme for main lake district of Dragon Lake

    • Vol. 28, Issue 12, (2007)
    • CLC: P64
    • Online First:18 October 2013,

      Published:2007

    移动端阅览

  • WU Xiong, ZENG Ping, HU Wenjie, et al. Optimization of excavation and seepage control scheme for main lake district of Dragon Lake[J]. 2007, 28(12). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

589

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Analysis of stress path and deformation-failure mechanism of high cutting loess slope
Influence of excavation unloading on vertical bearing behavior of existing pile groups
Measurement and analysis of impact of foundation pit excavation on below existed shield tunnels
Research for excavation and support design parameters of highway tunnel surrounding rock sub-classification
Research on failure mode of clay slope containing horizontal sand interlayer under excavation conditions

Related Author

HOU Xiao-kun
LI Tong-lu
LI Ping
WU Cheng-jie
YU Feng
GONG Xiao-nan
LIN Cun-gang
LIANG Rong-zhu

Related Institution

Key Laboratory for Geo-hazards in Loess Area of Ministry of Land and Resources, Xi’an Center of Geological Survey, China Geological Survey
School of Geological Engineering and Surveying, Chang’an University
School of Civil Engineering and Architecture, Zhejiang Sci-Tech University
MOE Key Laboratory of Soft Soils and Geoenvironmental Engineering, Zhejiang University
Research Center of Coastal and Urban Geotechnical Engineering, Zhejiang University
0