Research of reinforcement plan for red mud dam and construction processes emulation analysis
|更新时间:2026-06-25
|
Research of reinforcement plan for red mud dam and construction processes emulation analysis
Vol. 28, Issue 6, (2007)
作者机构:
1. 白城师范学院 土木工程系,吉林,白城,137000
2. 哈尔滨工业大学 土木工程学院,哈尔滨,150090
3. 四川农业大学 信息与工程技术学院,四川,雅安,625014
作者简介:
基金信息:
DOI:
CLC:TV698.2+3
Online First:13 September 2013,
Published:2007
稿件说明:
移动端阅览
ZHANG Bai-ling, ZHU Zhan-yuan, LING Xian-zhang, et al. Research of reinforcement plan for red mud dam and construction processes emulation analysis[J]. 2007, 28(6).
DOI:
ZHANG Bai-ling, ZHU Zhan-yuan, LING Xian-zhang, et al. Research of reinforcement plan for red mud dam and construction processes emulation analysis[J]. 2007, 28(6).DOI:
Research of reinforcement plan for red mud dam and construction processes emulation analysis
water penetration and leakage of red mud. The side slope of dam body basically is on the critical stability state. When triggered by some disadvantageous factors
the dam may remain widespread landslide. Based on fully studying geological conditions and frameworks of soil layers in a heap of dam areas
existing condition and formation cause of cracking
deformation course and destructive trend and principal influencing factor of stability and with a plentiful numerical experimentation and simulation analyses
a full-scale plan for reinforcement including draining
improving soil property of slide zone
cutting slope for reducing load
pressing slope base inversely
reinforced support and slope protection with suspension net by spouting
is put forward. The simulation analysis for reinforcement by construction course proves that the comprehensive plan is scientific and reasonable.