您当前的位置:
首页 >
文章列表页 >
Development of drill monitoring instrument for frozen soil settlement
更新时间:2026-06-25
    • Development of drill monitoring instrument for frozen soil settlement

    • Vol. 28, Issue 10, (2007)
    • CLC: TU415
    • Online First:15 October 2013,

      Published:2007

    移动端阅览

  • HU Ming-jian, WANG Ren, TAN shi-ling, et al. Development of drill monitoring instrument for frozen soil settlement[J]. 2007, 28(10). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

1282

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Monitoring data and finite element analysis of long term settlement of Yongjiang immersed tunnel
Monitoring and analysis of tunnel surface stability
Stress of large cylindrical caisson structure and its adjacent settlement
Settlement and contact pressure characteristics of the main building and annex with post-cast strips on medium or low compressible soil
Development of mechanical experimental system for interface layer between frozen soil and structure and its application

Related Author

XIE Xiong-yao
WANG Pei
LI Yong-sheng
NIU Jian-hong
QIN Hui
JIA Jian-qing
WANG Hong-tu
LIU Da-peng

Related Institution

Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education, Tongji University
Department of Geotechnical Engineering, Tongji University
Yongjiang Tunnel Administration
School of Traffic and Transportation, Lanzhou Jiaotong University
Key Laboratory for the Exploitation of Southwestern Resources & the Environmental Disaster Control Engineering, Ministry of Education, Chongqing University
0