您当前的位置:
首页 >
文章列表页 >
Mechanism of interaction between pre-reinforced anchor bolt and rock mass in high cutting slope
更新时间:2026-06-25
    • Mechanism of interaction between pre-reinforced anchor bolt and rock mass in high cutting slope

    • Vol. 28, Issue 5, (2007)
    • CLC: TU457
    • Online First:10 September 2013,

      Published:2007

    移动端阅览

  • HE Si-ming, LI Xin-po, WANG Cheng-hua. Mechanism of interaction between pre-reinforced anchor bolt and rock mass in high cutting slope[J]. 2007, 28(5). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

1653

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Research and analysis of comparative tests of optimization of methods for reinforcing soft surrounding rock of tunnel
Uplift mechanism of enlarged base of pedestal piles by numerical analysis
Experimental study on shear characteristics of mudstone under combined action of stress-dry-wet cycles
Elasto-viscoplastic bounding surface model for unsaturated time-dependent soils incorporating non-stationary flow rule
Experimental study on the definition and evolution characteristics of unfrozen water retention states in frozen clay

Related Author

LI Dan
BAI Shi-wei
CHEN Lu-wang
CHEN Hao
ZHAO Yu
WU Jiang-bin
WANG Wei-dong
HUANG Shao-ming

Related Institution

College of Urban Construction, Wuhan University of Science and Technology
State Key Laboratory of Geomechanics and Geotechnical Engineering,Institute of Rock and Soil Mechanics, Chinese Academy of Sciences
School of Resources and Environmental Engineering, Hefei University of Technology
College of Civil Engineering, Chongqing University
East China Architecture Design Institute
0