您当前的位置:
首页 >
文章列表页 >
Modeling of stability of a highway tunnel by using improved DDA method
更新时间:2026-06-25
    • Modeling of stability of a highway tunnel by using improved DDA method

    • Vol. 28, Issue 8, (2007)
    • CLC: TU47
    • Online First:15 October 2013,

      Published:2007

    移动端阅览

  • ZHANG Xiu-li, JIAO Yu-yong, LIU Quan-sheng, et al. Modeling of stability of a highway tunnel by using improved DDA method[J]. 2007, 28(8). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

1244

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Stability analysis of submarine slopes with asymmetric shear band propagation
Model test of highway tunnel construction underlying triple-decker mined-out area
Research on formation mechanism and stability of tensile cracking-sliding loess collapse
Determination of engineering parameters based on mutable characteristics of monitored values in numerical simulation
Stability analysis of high rock slope based on meticulous description of complex structure

Related Author

WU Guang-yao
ZHU Zhi-peng
WANG Dong
CUI Ge
FANG Yong
XU Chen
FAN Jian-guo
YE Wan-jun

Related Institution

Shandong Engineering Research Center of Marine Exploration and Conservation, Ocean University of China
Key Laboratory of Transportation Tunnel Engineering of Ministry of Education, Southwest Jiaotong University
College of Architecture and Civil Engineering, Xi'an University of Science & Technology
Sui-Yue Expressway Construction Manayement Office of Province
Tianxing Iron Mine, Hebei Iron Steel Group Mining Co. Ltd.
0