您当前的位置:
首页 >
文章列表页 >
Stability of boundary pillar of open pit and underground mine
更新时间:2026-06-25
    • Stability of boundary pillar of open pit and underground mine

    • Vol. 28, Issue 8, (2007)
    • CLC: TD322
    • Online First:15 October 2013,

      Published:2007

    移动端阅览

  • YAN Xiao-ming, LI Xi-bing, GUO Lei, et al. Stability of boundary pillar of open pit and underground mine[J]. 2007, 28(8). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

1317

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Numerical simulation analysis of influence of blasting construction of foundation trench of immersed tunnel on stability of embankment
Study of influence of shield tunneling on neighboring loaded piles
Stability analysis of the large ancient underground rock caverns in Longyou and the selection of maximum-security routes in the caverns
Uplift mechanism of enlarged base of pedestal piles by numerical analysis
Study on dynamical stability of deck rectangular thin plate in temperature field

Related Author

SHI Yong-sheng
YAO Jie
JIANG Yan
YANG Guang-hua
ZHANG Yu-cheng
LIN Shui-xian
YANG Ping
ZHU Feng-bin

Related Institution

School of Civil and Architectural Engineering, Wuhan University
Guangdong Research Institute of Water Resources and Hydropower
The Third Chinese Bureau of Construction Wuhan
College of Civil Engineering, Suzhou University of Science and Technology
College of Civil Engineering, Nanjing Forestry University
0