According to the excavation style and gradually adjusting of the stress after excavation in the tunnel
some typical sections are chosen to numerically analyze and forecast the status of rockburst in the whole calculational scope. According to the calculational result
some conclusions can be drawn as follows: the larger of the stress releasing coefficient has become
the area and the grade of rockburst would increase. For effectively avoiding or reducing the occurring of rockburst
the most prime support times for the different areas are given by analyzing the measuring data in-situ in this tunnel.