A mining construction method being aimed at Beijing region geological condition is brought forward for connecting tunnels based on two shield tunnels. Firstly
part of the shield segments in this maximal connecting tunnel section is taken off and a construction traverse channel is built. Secondly
each part of the connecting tunnel is constructed by regarding the traverse channel as a construction working face. Finally
A numerical simulation with FLAC software is adopted to probe surface subsidence and stratum plastic region distribution after the shield segments being disassembled and the tunnel cross-section being widened. The result indicates that the connecting tunnel between two shield tunnels can be constructed by using mining method; and the construction method is doable to Beijing region geological condition.
Coupling mechanism of seepage and heat transfer in rock fracture based on physics-informed neural networks
Influence of construction gap on the force of steel lining in compressed air storage cavern
Stability and failure mode analysis of tunnel face in composite ground with upper sand and lower clay layers
Characterization method for the three-dimensional soil cutting failure surface based on damage energy dissipation
Pullout simulation on fully grouted rock bolts based on residual shear strength
Related Author
WANG Zhi-liang1
XIAO Zhi-huan1
SHEN Lin-fang1
LI Shao-Jun2
ZHANG Gui-min
SUN Wen-qing
ZHU Ze-fan
SU Yong-kang
Related Institution
Faculty of Civil Engineering and Mechanics, Kunming University of Science and Technology
State Key Laboratory of Geomechanics and Geotechnical Engineering Safety, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences
School of Mechanics and Civil Engineering, China University of Mining and Technology
State Key Laboratory of Intelligent Construction and Healthy Operation and Maintenance of Deep Underground Engineering, China University of Mining and Technology