Study on deformation character of Three Gorges Project’s 2nd phase cofferdam during its operation period
|更新时间:2026-06-25
|
Study on deformation character of Three Gorges Project’s 2nd phase cofferdam during its operation period
Vol. 28, Issue 4, (2007)
作者机构:
1. 长沙理工大学岩土工程研究所,湖南,长沙,410076
2. 浙江大学建筑工程学院,浙江,杭州,310028
3. 中国长江三峡开发总公司,湖北,宜昌,443000
作者简介:
基金信息:
DOI:
CLC:TU433
Online First:05 September 2013,
Published:2007
稿件说明:
移动端阅览
JIANG Zhong-ming, GU Zheng-hua, ZHANG Xin-min, et al. Study on deformation character of Three Gorges Project’s 2nd phase cofferdam during its operation period[J]. 2007, 28(4).
DOI:
JIANG Zhong-ming, GU Zheng-hua, ZHANG Xin-min, et al. Study on deformation character of Three Gorges Project’s 2nd phase cofferdam during its operation period[J]. 2007, 28(4).DOI:
Study on deformation character of Three Gorges Project’s 2nd phase cofferdam during its operation period
Based on the Duncan E-? constitutive model used for analyzing soil-rock dams
3 parameters creep model used for studying creep deformation of soil-rock dams is developed and programmed. According to the measured deformation data of Three Gorges Project’s 2nd phase cofferdam of early operation period
calculation parameters used for creep analysis are inverse-analyzed using artificial neural networks. The calculated results indicate that the vertical deformation rule of cofferdam versus time and horizontal deformation rule of cofferdam versus time is different from each other. It is also indicated that the stable time needed for vertical creep displacement is about 6 months after the cofferdam is constructed and the stable time needed for horizontal creep displacement is only 3 months. It also shows that the average creep displacement value of the cofferdam structure is 2-3 times of the initial displacement.