Study on in-situ test of rock-bolted crane girder in Xiaowan Hydropower Station
更新时间:2026-06-25
    • Study on in-situ test of rock-bolted crane girder in Xiaowan Hydropower Station

    • Vol. 28, Issue 6, (2007)
    • CLC: TV223
    • Online First:13 September 2013,

      Published:2007

    移动端阅览

  • TU Zhi-jun, CUI Wei. Study on in-situ test of rock-bolted crane girder in Xiaowan Hydropower Station[J]. 2007, 28(6). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

1606

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Application of total station instrument and sliding micrometer to monitoring Shuibuya Underground Powerhouse
Stability analysis for random key block of underground power house of Three Gorges Project
Investigation on thickness selection method of sealing steel plate for CAES gas storage caverns
Evaluation of liquefaction flow characteristics and soil state of saturated sand based on tension and compression apparent viscosity
Elasto-viscoplastic bounding surface model for unsaturated time-dependent soils incorporating non-stationary flow rule

Related Author

QIN Wei-min
SUN Yi
CHEN Run-fa
WANG Hao
GE Xiu-run
SHENG Qian
HUANG Zheng-jia
WU Ai-qing

Related Institution

中国科学院武汉岩土力学研究所 岩土力学与工程国家重点实验室,武汉 430071 2. 湖北清江水电开发有限责任公司
Lab. of Rock and Soil Mechanics, Institute of Rock and Soil Mechanics,Chinese Academy of Sciences, Wuhan
Yangtze River Scientific Research Institute
0