Numerical analysis of means for reducing differential settlements of primary subway’s modification work in Tianjin
|更新时间:2026-06-25
|
Numerical analysis of means for reducing differential settlements of primary subway’s modification work in Tianjin
Vol. 28, Issue 4, (2007)
作者机构:
天津大学建筑工程学院,天津,300072
作者简介:
基金信息:
DOI:
CLC:TU433
Online First:05 September 2013,
Published:2007
稿件说明:
移动端阅览
ZHENG Gang, PEI Ying-jie. Numerical analysis of means for reducing differential settlements of primary subway’s modification work in Tianjin[J]. 2007, 28(4).
DOI:
ZHENG Gang, PEI Ying-jie. Numerical analysis of means for reducing differential settlements of primary subway’s modification work in Tianjin[J]. 2007, 28(4).DOI:
Numerical analysis of means for reducing differential settlements of primary subway’s modification work in Tianjin
The modification work of the subway #1 in Tianjin is the project reconstructed the stations and some tubes on the base of primary subway. The differential settlement at the juncture of new and old tubes must be controlled strictly for the sake of safety. The technique of high-pressure chemical churning piles is employed to consolidate the foundation. The consolidating means and thickness are determined by the result of FEM; by contrast to the measured data in-situ
the result of numerical calculation is testified to be proper and the design proposal is rational accordingly.