您当前的位置:
首页 >
文章列表页 >
Research on optimized construction procedure for double-arched tunnel in unsymmetrical pressure
更新时间:2026-06-25
    • Research on optimized construction procedure for double-arched tunnel in unsymmetrical pressure

    • Vol. 28, Issue 4, (2007)
    • CLC: U451+.1
    • Online First:05 September 2013,

      Published:2007

    移动端阅览

  • ZHANG Zhi-qiang, HE Chuan. Research on optimized construction procedure for double-arched tunnel in unsymmetrical pressure[J]. 2007, 28(4). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

1401

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Study of construction methods for crossing bias small interval highway tunnel
Dynamic simulation analysis of displacement field of bias closely spaced tunnel with altitude difference
Deformation and stress distribution of middle-wall for asymmetrically-loaded double-arch tunnel under complicated geological conditions
Research on construction technique and stability analysis of outlet in shallow tunnel under unsymmetrical pressure
Numerical analysis and treatment of a collapsed middle drift for shallow multi-arch tunnel under unsymmetrical pressure

Related Author

LI Yun-peng
WANG Zhi-yin
TANG Ming-ming
HUANG Hong-wei
DU Ju-hong
ZHU Zheng-guo
XU Gan-cheng
QIAO Chun-sheng

Related Institution

Beijing Key Laboratory of Urban Oil and Gas Distribution Technology, China University of Petroleum
China Construction Design International
Department of Geotechnical Engineering, Tongji University
Anhui Provincial Communications Investment Group Co. Ltd.
School of Civil Engineering and Architecture, Beijing Jiaotong University
0