high underground pressure and fragmentation of ore and rockmass
the Xiaoguanzhuang Iron Mine is one of the most difficult excavation iron mine in China. The study results in recent years indicate that the rockmass of Xiaoguanzhuang Iron Mine has the creep characteristic. After the roadway was excavated
the destruction of supporting roadway is very severe. The deformation of roadway is no convergence deformation; and the iron mine is difficult support mine. According to the field condition
in order to know the distribution law of underground pressure
we used the rock failure process analysis (RFPA)
in which the creep evolvement model is drawn into the numerical model
to model the excavation process of roadway by adopting the non-pillar sublevel caving; and numerically analyze the stress distribution of surrounding rock. We found that the surrounding rock occur the creep deformation along with time when the roadway is caving. Because of the creep deformation of roadway
the destruction of roadway is mainly rib spalling
floor heave and roof falling etc.. At the same time
the high stress concentration leads to the severe destruction of pillar between two roadways. Along with the caving of roadway
the stress diverts into surrounding roadway of the newly caved roadway. Because of the multi-step caving
the high stress convergence occurs in the boundary ores
which leads to the difficult excavation of boundary ore. The numerical result is in accordance with the result of field investigation. From the numerical result we concluded that the creep characteristic of rockmass and the multi-step excavation mainly lead to the destruction of roadway.