您当前的位置:
首页 >
文章列表页 >
Safety Monitoring and stability analysis of surrounding rock and side slope for right bank diversion tunnels under construction of Jinping-1 Hydropower Project
更新时间:2026-06-25
    • Safety Monitoring and stability analysis of surrounding rock and side slope for right bank diversion tunnels under construction of Jinping-1 Hydropower Project

    • Vol. 27, Issue S1, (2006)
    • CLC: TV551.1+2
    • Online First:15 December 2006,

      Published:2006

    移动端阅览

  • HUANG Zhi-peng, DONG Yan-jun. Safety Monitoring and stability analysis of surrounding rock and side slope for right bank diversion tunnels under construction of Jinping-1 Hydropower Project[J]. 2006, 27(S1). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

185

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Modified Monte Carlo techniques by rotating slip segments for searching general critical slip surface(Ⅰ): random angle of rotation
Study of applications of meeting ant colony algorithm to search non-circular critical slip surface of slope
A new search algorithm for strength anisotropy slope stability analysis based on numerical stress field
Gaussian process-based dynamic response surface method for estimating slope failure probability
Study of deformation characteristics of slope rockmass at project of water diversion from Hanjiang River to Weihe River

Related Author

ZHANG Lu-yu
ZHANG Jian-min
GAO Wei
ZHANG Fei-jun
CHEN Li-ping
ZHANG Ding-li
FANG Qian
YING Guo-gang

Related Institution

Institute of Geotechnical Engineering, Tsinghua University
College of Civil and Transportation Engineering, Hohai University
Wuhan Construction Engineering (Group) Co., Ltd.
Key Laboratory for Urban Underground Engineering of Education Ministry, Beijing Jiaotong University
Jiangsu Transportation Research Institute Co., Ltd.
0