Research on blasting vibration regularity of
bedrock digging of embankment project
|更新时间:2026-06-25
|
Research on blasting vibration regularity of
bedrock digging of embankment project
Vol. 27, Issue S1, (2006)
作者机构:
重庆大学 西南资源开发及环境灾害控制工程教育部重点实验室,重庆,400044
作者简介:
基金信息:
DOI:
CLC:TU457
Online First:15 December 2006,
Published:2006
稿件说明:
移动端阅览
HU Guo-zhong, WANG Hong-tu, LI Xiao-hong, et al. Research on blasting vibration regularity of
bedrock digging of embankment project[J]. 2006, 27(S1).
DOI:
HU Guo-zhong, WANG Hong-tu, LI Xiao-hong, et al. Research on blasting vibration regularity of
bedrock digging of embankment project[J]. 2006, 27(S1).DOI:
Research on blasting vibration regularity of
bedrock digging of embankment project
Based on bedrock digging of embankment project in the Three Gorges Proiject
the choice of measurement method and object of vibration by blasting earthquake wave induced by bedrock digging of embankment project were studied. Via regression analysis of the results of measurement on blasting vibration
the spread and attenuation regularity of vibration velocity of blasting were established. Combined the project
the vibration frequency of earthquake wave induced by blasting of bedrock digging and the vibration frequencies of surrounding buildings in blasting zone were contrasted and analyzed. After analyzing
the vibration frequency by blasting of this digging project was far bigger than the itself vibration frequency of structure of surrounding civilian house; consequently the safety of surrounding buildings were assured. At the same time
integrated the digging blasting construction of embankment project
the safety control standard of blasting vibration by this blasting engineering was confirmed from the two aspects such as safety vibration velocity of buildings and safety distance of blasting vibration; consequently
it is shown that the construction task of this blasting project were done safely; and the safety of surrounding buildings were assured while blasting was on. This research has played an important role in coaching blasting construction of bedrock digging and assuring the safety of ground buildings.