您当前的位置:
首页 >
文章列表页 >
Study on prediction of chimney foundation settlement of Yangluo Power Plant in Wuhan
更新时间:2026-06-25
    • Study on prediction of chimney foundation settlement of Yangluo Power Plant in Wuhan

    • Vol. 27, Issue S1, (2006)
    • CLC: TU451
    • Online First:15 December 2006,

      Published:2006

    移动端阅览

  • LUO Hong-ming, TANG Hui-ming, YAN E-chuan. Study on prediction of chimney foundation settlement of Yangluo Power Plant in Wuhan[J]. 2006, 27(S1). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

79

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Stability analysis of close-located underground caverns based on tunnel lining and equivalent anchor bolt simulation
Determination of engineering parameters based on mutable characteristics of monitored values in numerical simulation
Numerical model and validation of failure mode for underground caverns in layered rock mass
A method for searching potential failure surface of slope based on maximum shear strain increment
Simulation of opening displacement of brittle rockmass at point of energy dissipation

Related Author

LIU Jie
TANG Liang
LI Jian-lin
HU Jing
FAN Liu-jun
XIA Jun
HUANG Gang-hai
ZUO Shuang-ying

Related Institution

Key Laboratory of Geological Hazards on Three Gorges Reservoir Area, Ministry of Education, China Three Gorges University
College of Hydraulic & Environmental Engineering, China Three Gorges University
Institute of Rock and Soil Mechanics, Chinese Academy of Sciences
College of Resources and Environment Engineering, Guizhou University
State Key Laboratory of Geomechanics and Geotechnical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences
0