您当前的位置:
首页 >
文章列表页 >
Risk analysis of overlength bored piles construction on complicated geological conditions
更新时间:2026-06-25
    • Risk analysis of overlength bored piles construction on complicated geological conditions

    • Vol. 27, Issue S1, (2006)
    • CLC: TU71
    • Online First:15 December 2006,

      Published:2006

    移动端阅览

  • WANG You-zhi, CHANG Xiao-li, WANG Xiao-ping. Risk analysis of overlength bored piles construction on complicated geological conditions[J]. 2006, 27(S1). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

215

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Comprehensive risk analysis of TBM construction accident induced by tunnel deformations
Reliability analysis of foundation bearing capacity based on combined coefficients of variation
Causes of geological hazards and risk control of collapse in shallow tunnels
Oil and gas leakage risk analysis of underground storage caverns in bedded salt rock using fault tree analysis
Seismic risk analysis of earth-rock dam based on deformation

Related Author

YANG Sheng-qi
HE Dong-qing
WEN Sen
LIU Fu-ling
CAO Yu-chun
LI Li-ping
ZHOU Zong-qing
LI Shu-cai

Related Institution

State Key Laboratory for Geomechanics and Deep Underground Engineering, China University of Mining and Technology
School of Civil Engineering and Architecture, Henan University
School of Civil Engineering, Henan University of Urban Construction
School of Civil Engineering and Architecture, Zhejiang University of Science and Technology
Research Center of Geotechnical and Structural Engineering, Shandong University
0