Analysis of outrush and forecast during construction of
diversion tunnels of a hydroplant
|更新时间:2026-06-25
|
Analysis of outrush and forecast during construction of
diversion tunnels of a hydroplant
Vol. 27, Issue S2, (2006)
作者机构:
中国水电顾问集团成都勘测设计研究院,成都,610072
作者简介:
基金信息:
DOI:
CLC:TV732
Online First:16 December 2006,
Published:2006
稿件说明:
移动端阅览
LI Pan-feng, ZHANG Shao-cheng, CUI Chang-wu. Analysis of outrush and forecast during construction of
diversion tunnels of a hydroplant[J]. 2006, 27(S2).
DOI:
LI Pan-feng, ZHANG Shao-cheng, CUI Chang-wu. Analysis of outrush and forecast during construction of
diversion tunnels of a hydroplant[J]. 2006, 27(S2).DOI:
Analysis of outrush and forecast during construction of
diversion tunnels of a hydroplant
In this paper the outrush accidents during construction period of a hydroplant’s diversion tunnels and their main characteristics are introduced in brief. Then the reasons of outrush accidents are analyzed based on rock mass structure and hydrogeological conditions. At last the outrush scopes are forecasted simply according to the outrush data and surrounding rock mass geological conditions.
Safety Monitoring and stability analysis of surrounding rock and side slope for right bank diversion tunnels under construction of Jinping-1 Hydropower Project
Stability analysis of Goupitan diversion tunnel in soft rock
Progressive fracture evolution and mechanical response of cavity-containing sandstone under low-frequency disturbance
Hydraulic scouring resistance characteristics of geosynthetics reinforced slopes
Strength development model for slurry-like mud treated by physicochemical combined method considering preloading stress
Related Author
HUANG Zhi-peng
DONG Yan-jun
FU Jing
ZHANG Lian
DING Xiu-li
Related Institution
Chongqing Rock Foundation Research Center, Yangtze River Scientific Research Institute
Key Laboratory of Geotechnical Mechanics and Engineering of the Ministry of Water Resources, Yangtze River Scientific Research Institute