Three-dimensional numerical simulation of high slope
of Zipingpu Hydraulic Project
|更新时间:2026-06-25
|
Three-dimensional numerical simulation of high slope
of Zipingpu Hydraulic Project
Vol. 27, Issue S1, (2006)
作者机构:
山东大学 岩土与结构工程研究中心,济南,250061
作者简介:
基金信息:
DOI:
CLC:U452
Online First:15 December 2006,
Published:2006
稿件说明:
移动端阅览
YANG Wei-min, ZHANG Qiang-yong, LI Shu-cai, et al. Three-dimensional numerical simulation of high slope
of Zipingpu Hydraulic Project[J]. 2006, 27(S1).
DOI:
YANG Wei-min, ZHANG Qiang-yong, LI Shu-cai, et al. Three-dimensional numerical simulation of high slope
of Zipingpu Hydraulic Project[J]. 2006, 27(S1).DOI:
Three-dimensional numerical simulation of high slope
of Zipingpu Hydraulic Project
The outlet of the diversion tunnel #2 of Zipingpu Hydraulic Project is located on downriver side of the right bank chine. It is under the trough valley formed by the huge fault zone. It happened several times that the overburden layer of the slope slide during the construction. The safety of people lived near the project was threatened and the construction progress of the whole project was badly affected. Many kinds of methods were synthetically taken to maintain the stability of the slope. FLAC3D is used to simulate the excavation with the prestressed cables and friction piles. The effect of the support is analyzed from displacement field
stress field and other aspects. The results show that the support can remarkably control the deformation of the slope and the slope was stable after reinforce.