Application of incremental displacement back analysis to underground power-house of Laxiwa Hydropower Station
Vol. 27, Issue S2, (2006)
作者机构:
1. 西安理工大学 岩土工程研究所,西安,710048
2. 中国科学院寒旱所冻土工程国家重点实验室,兰州,730000
作者简介:
基金信息:
DOI:
CLC:TU443
Online First:16 December 2006,
Published:2006
稿件说明:
移动端阅览
JING Mao-gui, LI Ning, YAO Xian-chun, et al. Application of incremental displacement back analysis to underground power-house of Laxiwa Hydropower Station[J]. 2006, 27(S2).
DOI:
JING Mao-gui, LI Ning, YAO Xian-chun, et al. Application of incremental displacement back analysis to underground power-house of Laxiwa Hydropower Station[J]. 2006, 27(S2).DOI:
Application of incremental displacement back analysis to underground power-house of Laxiwa Hydropower Station
The displacement from back analysis has been extensively applied to underground projects because it can be measured conveniently
accurately and economically. A dynamic multi-step finite element model is established to simulate the excavation process of Laxiwa underground power-house using the large software FINAL which is introduced from Austria. The data of incremental displacement during the third layer’s excavation are applied to back analysis with the established finite element model to calculate parameters of initial geostress and elastic modulus. Finally
the results of back analysis are used to predict the stability of surrounding rocks during the later excavation. The comparison between computed and measured incremental displacements show a good coincidence